Skip to content
杭州喜马卑斯运动服饰
0 items in cart

Cart

Your cart is empty.

HEMALPS Order Process
HEMALPS // ORDER PROCESS & LEAD TIMES

How an Order Runs: 45 to 60 Days

A transparent breakdown of a typical 100-piece custom cycling or running capsule. Your production dates move with fabric availability and PP sign-off, not with our queue.

// STAGE-BY-STAGE DELIVERABLES

Clear Roles, Predictable Milestones

Every milestone has a defined owner and tangible deliverable. No ambiguity on approvals or shipment schedules.

01
Day 0 • Owner: You

Project Brief & Target Parameters

Submit your technical tech pack, vector artwork, target silhouette, and FOB/DDP destination. If you do not have a full tech pack, send reference samples and physical performance benchmarks.

Deliverable Artifact Tech pack / CAD / Photo
02
≤ Day 1 (Within 12h) • Owner: HEMALPS

Fabric Options, Trim Specs & Tiered Quote

We provide formal commercial proposals with net fabric yields, Italian mill options (MITI® / Carvico® / Elastic Interface®), zipper hardware, and tiered volume pricing for 50, 100, 200, and 500 pcs.

Deliverable Artifact PDF Quote + Detailed BOM
03
Day 3–10 • Owner: HEMALPS

Digital 2D/3D CAD & Physical Evaluation Sample

Pattern makers grade size blocks (XS–3XL). Our sample room constructs 1–5 wearable prototype evaluation garments utilizing production-grade fabrics and chamois pads. Dispatched via express air freight (3–5 days).

Deliverable Artifact Wearable Physical Sample
04
Day 16–20 • Owner: Collaborative

Fit Review, Lab Dip & Pre-Production Sign-Off

You review the physical sample on rider/runner fit models. Any minor micro-adjustments to sleeve tension, gripper width, or collar height are locked in. Final fabric booking and sublimation strike-offs approved.

Deliverable Artifact PP Sample Approval Sheet
05
Day 20–40 • Owner: HEMALPS

Bulk Precision Cutting, Stitching & 4-Point QA

Automated laser cutting, ultrasonic bonding, 4-needle-6-thread flatlock assembly, and Italian chamois pad setting across 12 automated hanger lines. 100% in-line and end-of-line measurement verification.

Deliverable Artifact Bulk Goods + Inspection Report
06
Day 40–55 • Owner: HEMALPS

Export Customs & FOB / CIF / DDP Delivery

Export dispatch through Shanghai or Ningbo ports. Air freight reaches your European or US distribution hub in 3–5 days; ocean freight arrives in 18–25 days with all customs clearance handled.

Deliverable Artifact B/L, Commercial Invoice, Packing List
Reorder Efficiency: Subsequent replenishment runs skip steps 01–04 and dispatch in 15–25 working days. Inquire Now →

Start Your Project With an Engineering Brief

Submit your styles, target quantities, and tech pack. First written quote delivered within 12 working hours.

Request Production RFQ →
WhatsApp Chat Quick RFQ • MOQ 50