Skip to content
杭州喜马卑斯运动服饰
0 items in cart

Cart

Your cart is empty.

HEMALPS Capabilities
HEMALPS // OEM & ODM PRODUCTION CAPABILITIES

Turnkey OEM & ODM Capabilities

From digital 2D/3D CAD pattern calibration to volume cutting, high-elasticity flatlocking, and DDP export. Built for athletic apparel labels that demand technical precision from 50 pieces.

// 01 PATTERN MAKING

2D / 3D CAD Engineering

In-house pattern grading across adult sizes XS–3XL. Digital 3D tension simulation optimizes garment compression curves before physical cutting.

✓ 7–10 Day Prototyping
// 02 RAPID SAMPLING

Physical Evaluation Samples

Wearable pre-production samples (1–5 pcs) crafted with final production fabrics, silicones, and chamois pads for real-world fit validation.

✓ DHL / FedEx 3–5d Air
// 03 BULK ASSEMBLY

Agile Vertical Production

Flexible minimum orders starting at 50 pcs per style/colorway. Scalable through 12 automated overhead hanger lines up to 20,000 units monthly.

✓ 15–25 Day Bulk Lead Time
// 04 GLOBAL EXPORT

FOB, CIF & DDP Logistics

Direct export from Shanghai (CNSHA) and Ningbo (CNNGB) seaports. Comprehensive customs clearance and DDP door-to-door delivery to EU and North America.

✓ Full Customs Handled
// TURNKEY SOURCING TIMELINE

How an Order Runs: 45 to 60 Days

A predictable, milestone-driven framework for custom cycling and running apparel. Production milestones move with fabric arrival and pre-production sample approval.

01
Day 0 • Owner: Brand Buyer

Project Brief & Target Parameters

Submit your technical tech pack, vector artwork, target silhouette, and FOB/DDP destination.

Deliverable Tech pack / CAD
02
≤ Day 1 (Within 12h) • Owner: HEMALPS

Fabric Options, Trim Specs & Tiered Quote

Formal commercial proposals with fabric options, chamois pads, zippers, and tiered volume pricing for 50, 100, 200, and 500 pcs.

Deliverable PDF Quote + BOM
03
Day 3–10 • Owner: HEMALPS

Digital CAD Grading & Physical Evaluation Sample

2D/3D CAD grading across XS–3XL. Our sample room crafts 1–5 wearable prototype pieces using production-grade materials.

Deliverable Wearable Prototype
04
Day 16–20 • Owner: Joint Review

Pre-Production (PP) Sign-Off & Mill Dye Lots

Rider fitting feedback integrated, lab dips approved, and Italian mill yardage allocated for bulk cutting.

Deliverable Signed PP Golden Sample
05
Day 20–40 • Owner: HEMALPS

CNC Laser Cutting, Flatlock & 4-Point QA

Full vertical assembly on overhead conveyors, bonding, chamois insertion, and 100% pre-pack quality control.

Deliverable Comprehensive QA Report
06
Day 40–55 • Owner: HEMALPS

Seaport Export & Door-to-Door Delivery

FOB Shanghai/Ningbo or DDP air/ocean delivery directly to your distribution center with all duties cleared.

Deliverable B/L, Commercial Invoice, Packing List
Speed Advantage: Reorders skip prototype phases and ship within 15–20 working days. Air: 3–5d • Ocean: 18–25d
// PRODUCTION TOLERANCE BENCHMARKS

Sizing & Manufacturing Tolerance Standards

Every technical garment is inspected against international 4-point quality standards. We hold tighter tolerances than general sportswear industry baselines.

Measurement Point Cycling Jersey Cycling Bib Short Running Singlet Industry Baseline
1/2 Chest / Bust Width ± 0.5 cm — ± 0.5 cm ± 1.5 cm
Center Front Length ± 0.5 cm — ± 0.5 cm ± 1.5 cm
Inseam Length — ± 0.5 cm — ± 1.0 cm
Leg Opening / Gripper Width — ± 0.3 cm — ± 1.0 cm
Chamois Alignment Center — ± 0.2 cm — ± 0.8 cm

Ready to Start Your Custom Program?

Submit your tech pack or reference photos. First engineering review and volume quote delivered within 12 working hours.

WhatsApp Chat Quick RFQ • MOQ 50